What does a rack and stack contractor actually do?

A rack and stack contractor receives and verifies equipment, installs rails, connects A and B feed power, and health-checks each unit by LED and by BMC, iDRAC or iLO. The result is documented as a rack elevation, an asset list, serial numbers and a port map. CTS does not install operating systems.

The job

Rack and stack is the physical installation of equipment into racks and its connection to power. It ends with a rack that is ready for the next stage.

Receive and verify

Equipment arrives and is received and verified. Anything damaged or missing is found here, before it is installed.

Rails and mounting

Rails are installed and the units are mounted in the rack.

A and B feed power

Racks are usually fed from two independent power feeds, A and B, so the loss of one does not take the equipment down. Each unit is connected across both feeds.

Health check

Each unit is checked after power-up. The contractor reads the indicator LEDs and the unit's management controller, such as BMC, iDRAC or iLO, for hardware status.

Documentation

The rack is documented as a rack elevation, an asset list, serial numbers and a port map. Anyone who works on the rack later can see what is in it and how it is connected.

What it does not include

CTS does not install operating systems. Rack and stack ends at a health-checked, documented rack.